图片展示

NEWS DETAIL

Wind turbine installation vessel N996 delivered

2022-12-29 16:30:35

Click:

The wind turbine installation vessel N966, built by COSCO SHIPPING (Qidong) Offs

The wind turbine installation vessel N966, built by COSCO SHIPPING (Qidong) Offshore, started the sailing on 20th December 2022  to serve at Dogger Bank, the world’s largest offshore wind farm located more than 130km off the North East coast of England. 

N966 is the world's first self-elevating and self-propelled WTIV at the 3,000-ton class and the main crane’s lifting capacity reaches over record-breaking 3,200 tons. The vessel’s maximum lifting height can reach 325 meters, with an operating depth of up to 80 meters and a payload of over 16,000 tons. 

DMA supplied HVAC&refrigeration system package including chiller, air handling unit, fan coil unit, fire damper, heaters, etc, for this vessel, and finished commissioning successfully.




Author: DMA Marine
0
Wind turbine installation vessel N996 delivered
The wind turbine installation vessel N966, built by COSCO SHIPPING (Qidong) Offs
Long by picture save/share

About Us

——

图片展示

Products

——

News

——

Contact Us

——

图片展示

NUMBERS

T:+86 21 6089 8599  

F:+86 21 6089 8599*6198  

e-mail

info@dma-marine.com

HEADQUARTER  ADDRESS

No.180 Gangying Road, Pudong, Shanghai, China, 200137.


DMA Marine. ALL rights reserved .2023

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了